Showing 32 of 32 projects
Roads & BridgesKathmandu-Terai/Madhesh Expressway
DGPS Survey and Detail Topographic Survey of the intersection area for Nepal's major expressway project, executed for the Government of Nepal and Nepalese Army.
Environmental StudiesRapti and Duduwa River Sand & Gravel Collection
Initial Environment Examination (IEE) and Geological Investigation for collection of Sand and Gravel from Rapti and Duduwa River.
Roads & BridgesDudhuwa Khola Bridge (70m)
Feasibility Study, Detailed Engineering Survey, Geological Investigation, Hydrological Analysis, and Detailed Design with Cost Estimation for the 70m bridge.
Roads & BridgesSASEC Road Improvement Project
Detail Topographic Survey and Geological Investigation of different bridges for the ADB-funded SASEC Road Improvement Project (50 km section).
Environmental StudiesHotel Jungle Vista - BES
Brief Environment Study (BES) for Hotel Jungle Vista, conducted for the Regional Hotel Association Nepal, Sauraha.
Environmental StudiesEden Jungle Resort - IEE
Initial Environment Examination (IEE) of Eden Jungle Resort for the Regional Hotel Association Nepal.
Environmental StudiesChitwan Forest Resort - BES
Brief Environment Study (BES) of Chitwan Forest Resort for the Regional Hotel Association Nepal.
Environmental StudiesChitwan Park Cottage - BES
Brief Environment Study (BES) of Chitwan Park Cottage for the Regional Hotel Association Nepal.
Environmental StudiesWild Adventure Resort - BES
Brief Environment Study (BES) of Wild Adventure Resort for the Regional Hotel Association Nepal.
Environmental StudiesSafari Park Hotel and Lodge - IEE
Initial Environment Examination (IEE) of Safari Park Hotel and Lodge for the Regional Hotel Association Nepal.
Environmental StudiesHotel Hermitage - BES
Brief Environment Study (BES) of Hotel Hermitage for the Regional Hotel Association Nepal.
Environmental StudiesEvergreen Eco-Lodge - BES
Brief Environment Study (BES) of Evergreen Eco-Lodge and Restaurant for the Regional Hotel Association Nepal.
Environmental StudiesHotel Royal Safari - IEE
Initial Environment Examination (IEE) of Hotel Royal Safari for the Regional Hotel Association Nepal.
Environmental StudiesHotel Rainforest - BES
Brief Environment Study (BES) of Hotel Rainforest for the Regional Hotel Association Nepal. (Ongoing)
Environmental StudiesChitwan Mid Town Resort - IEE
Initial Environment Examination (IEE) of Chitwan Mid Town Resort Pvt. Ltd. (Ongoing)
GIS MappingGIS Mapping - Nalinchowk Feeder
GIS mapping and Consumer Indexing for Nalinchowk Feeder, conducted for GIZ Nepal. (Ongoing)
GIS MappingGIS Mapping - Nagarkot Feeder
GIS mapping and Consumer Indexing for Nagarkot Feeder, conducted for GIZ Nepal. (Ongoing)
Buildings & InfrastructureGobardhan Dam Masterplan
Detailed Engineering Survey, Design and Detailed Report Preparation of Gobardhan Dham (0.95 Ha) for the Government of Nepal.
Roads & BridgesSundarmunda Marga Road Project
Detailed Engineering Survey, Design and Detailed Report Preparation of Sundarmunda Marga (5.3 Km) for the Government of Nepal.
Water ResourcesPokhara Wastewater Management Master Plan
Socio-Economic Design Survey for the Development of Master Plan for Wastewater Management in Pokhara Metropolitan City for JICA and Yachiyo Engineering Co., Ltd.
Environmental StudiesCitizen Investment Trust (CIT) - IEE
Initial Environment Examination (IEE) of Citizen Investment Trust. (Ongoing)
Buildings & InfrastructureCentral Infectious Disease Hospital
MEP Design and Report for the 300-bed Central Infectious Disease Hospital, providing comprehensive mechanical, electrical, and plumbing engineering solutions.
Buildings & InfrastructureNardevi Ayurvedic Central Hospital
MEP Design and Report for the Nardevi Ayurvedic Central Hospital, providing mechanical, electrical, and plumbing engineering solutions.
Environmental StudiesHotel Aikawa Inn - IEE
Initial Environment Examination (IEE) of Hotel Aikawa Inn for the Regional Hotel Association Nepal. (Ongoing)
Roads & BridgesQuarry Site Survey - Pataliya-Hetauda Road
Quarry Site Survey of Pataliya - Hetauda - Narayangad Road Section for the SASEC Project.
Water ResourcesItahari Water Supply Project
Detail Analysis Survey of Water Supply Project for A.B.M Engineering Consultancy Pvt. Ltd.
Roads & BridgesPatalya-Hetauda Road - Geological Study
Detail Geological Study and Topographical Survey of Patalya-Hetauda Road Section for the SASEC Project.
Water ResourcesJhapa Water Supply Project
Detail Analysis Survey of Water Supply Project for A.B.M Engineering Consultancy Pvt. Ltd.
Environmental StudiesHotel Monalisa Chitwan - EIA
Environment Impact Assessment (EIA) and Geological Investigation for Hotel Monalisa Chitwan Pvt. Ltd. (Ongoing)
Buildings & InfrastructureCommunity Building at Myanglung
Preparation of Detailed Design, Structural Analysis, Geological Investigation and Cost Estimation of community building.
International ProjectsSocio-Economic Design Survey
Social Condition Survey for the project for Development of Master Plan for Wastewater Management in Pokhara Metropolitan City
International ProjectsSEA Report
Project for Capacity Development on Flood Control for Disaster Risk Reduction in Sunsari and Morang Districts
